AccessRoute HK

Testing and scene coverage.

Routing, map contracts and journey recovery are checked against the same data used by the product.

Regression record · 18 October 2026

Regression results.

Automated regression checks cover the routing core, workflows, HTTP interfaces and shared session state.

132tests passed
16test files
12registered scenes
Read the test record ↗
What the checks cover

Test coverage.

These are software regression checks of defined routes, events and state transitions.

AreaCheckExpected behaviour
Accessibility policiesStairs, escalators, slope and unknown attributesHard constraints exclude the affected graph edges.
Weather and objectivesDistance, shelter, indoor routing, effort and timeThe selected objective changes route cost and preference ordering.
Facility eventsClosure, restoration and alternate routesThe remaining route changes or returns a clear no-route state.
Photo workflowsObservation, map IDs and candidate confirmationOnly valid candidates from the current map can be applied.
Journey sessionsCommand versions, reconnection, reset and persistenceThe phone and console retain a consistent state.
Scene contractsManifest, graph, floor and facility referencesEach scene loads through the same validated schema.
Scene coverage

The scene catalogue.

The catalogue combines malls, government buildings, markets and community facilities.

Hysan Place

2 mapped levels

PopCorn 2

2 mapped levels

Festival Walk / Kowloon Tong footbridges

11 mapped levels

Shek Kip Mei Estate Ancillary Facilities Block

2 mapped levels

Cheung Sha Wan Government Offices

2 mapped levels

Sha Tin Government Offices

4 mapped levels

North Point Government Offices

2 mapped levels

Pei Ho Street Municipal Services Building

2 mapped levels

Java Road Municipal Services Building

2 mapped levels

Kowloon City Municipal Services Building

2 mapped levels

Tai Po Hui Market and Cooked Food Centre

2 mapped levels

Kwai Hing Government Offices

2 mapped levels

Eleven scenes use official floor and unit geometry. Kowloon Tong / Festival Walk uses a layered pedestrian network. Download the scene catalogue

Route recovery

Route recovery
examples.

Lift A closes

A confirmed closure targets Lift A. The event policy removes its affected edges, and the planner selects a remaining path through Lift B when that path is available.

A landmark resets the origin

Confirming the A-1 Bakery candidate moves the start anchor to the nearby LG1 public passage. The route is recalculated from that node.

Next measurements

Field evaluation.

A field evaluation can record journey completion, time to recover after a simulated closure, labelled-photo match accuracy and task-level model latency and cost.

The Kowloon Tong route provides a concrete setting for comparing these measures across mobility profiles.

See the field journey ↗